• advanced
Barrie 'Baza' Donaldson and David 'Robo' Robertson remove scaffold above the...
10/2011
While the majority of workers were able to access the bridge using...
11/2011
William Waddell, in full access gear, perpares to paint contact points on...
10/2011
While the majority of workers were able to access the bridge using...
10/2011
Kevin McFarlane enjoys a cup of tea during the morning break in the office on...
10/2011
Abseiler preparing to carry out touch points from the top of the Fife...
11/2011
Materials waiting to be moved offsite by road transport. The 125 year old...
11/2011
Over 4,000 tonnes of scaffolding was used to enable safe access to the bridge.
10/2011
Kenneth Fox in the Fife yard from where materials are moved offsite by road...
11/2011
Hoist operator Neil 'Neily' Louden takes in the sunrise as the hoist...
11/2011
Abseiler preparing to carry out touch points from the top of the Fife...
11/2011
An alimac hoist on the side of Inchgarvie shuttles workers and materials...
10/2011
A worker sorts out scaffolding by the 125 year old Forth Rail Bridge which...
11/2011
Work was undertaken on a 24 hour basis, sometimes in the rain on the 125 year...
11/2011
Work was undertaken on a 24 hour basis on the 125 year old Forth Rail Bridge...
11/2011
powered by infradox.com