G.M.B. Akash

Narayanganj, Bangladesh

A worker at the Siddhirganj 2×120 MW Peaking Power Plant Project, built on the bank of the river Shitalakhya, whose construction was funded by Asian Development Bank.

Part of story
Object Name
Copyright
G.M.B. Akash
City
Narayanganj
Country
Bangladesh
Restrictions
Max size
High Resolution
5000 x 3334 pixels
42.33 x 28.23 cm (300 dpi)
16.67 x 11.11 inch (300 dpi)
3.6 MB size on disk
powered by infradox.com