Fernando Moleres

Panama Canal, Panama

A control tower built during the Panama Canal Expansion project. When the Panama Canal Expansion is complete, 26 June 2016, ships specified as New Panimax, 320.04m (1,050ft) (l) x 33.54m (110ft) (w) x 12.56m (41.2ft) (d), will be able to pass through the canal. The works involve two new sets of locks at the Pacific and Atlantic ends and new channels leading to them as well as increasing the capacity of Lake Gatun which supplies water and would run dry given the increased requirements of the new locks. Also the canals existing channels will be made wider and deeper.

Object Name
Copyright
Fernando Moleres
City
Panama Canal
Country
Panama
Restrictions
Not available in Germany, Italy, France or Spain
Max size
High Resolution
4000 x 4000 pixels
33.87 x 33.87 cm (300 dpi)
13.33 x 13.33 inch (300 dpi)
1.4 MB size on disk
powered by infradox.com