Fernando Moleres

Panama Canal, Panama

A new set of locks at the Pacific end of the Panama Canal. Construction work for the Panama Canal Expansion will allow ships specified as New Panimax, 320.04m (1,050ft) (l) x 33.54m (110ft) (w) x 12.56m (41.2ft) (d), to pass through the canal. The works, due to open on 26 June 2016, involve two new sets of locks at the Pacific and Atlantic ends and new channels leading to them as well as increasing the capacity of Lake Gatun which supplies water and would run dry given the increased requirements of the new locks. Also the canals existing channels will be made wider and deeper.

Object Name
Copyright
Fernando Moleres
City
Panama Canal
Country
Panama
Restrictions
Not available in Germany, Italy, France or Spain
Max size
High Resolution
6000 x 4000 pixels
50.8 x 33.87 cm (300 dpi)
20 x 13.33 inch (300 dpi)
6.2 MB size on disk
powered by infradox.com