A worker from Weatherford International, an Esso contractor, during the installation of underground water pumps on RIG 292 at the Kome 5 oil well. Chadian oil is heavy, and at low pressure so cannot spout up naturally. To extract it, water has to be pumped underground.

Part of story
Object Name
Copyright
Frederic Noy/Panos Pictures
City
Kome 5
Country
Chad
Restrictions
Not available in France.
Max size
High Resolution
4288 x 2848 pixels
36.31 x 24.11 cm (300 dpi)
14.29 x 9.49 inch (300 dpi)
4.6 MB size on disk
powered by infradox.com